projects
Excellence in Every Structure
🏗️ Precision in Every Span. Strength in Every Structure.
Steel Works proudly presents the trial assembly of a 62-metre Open Web Girder for a Rail Overbridge (ROB) across the Howrah–Mumbai Railway Line.
Project Location: Near Jairam Nagar Railway Station Yard, Masturi–Seepat Road
Key Specifications:
Length: 62 m (Centre to Centre)
Width: 16.3 m (Centre to Centre)
Height: 8.1 m (Centre to Centre)
This project showcases our expertise in heavy structural steel fabrication, precision engineering and complex bridge assembly, supporting the development of India’s railway infrastructure.
At Steel Works, we continue to build on strength and deliver engineering excellence, one structure at a time.
STEEL WORKS
Built on Strength. Shaping a Sustainable Tomorrow.
#SteelWorks #SteelBridges #OpenWebGirder #RailwayInfrastructure #HeavyFabrication #StructuralSteel #BridgeEngineering #InfrastructureDevelopment #MakeInIndia
Precision. Collaboration. Engineering Excellence.
Steel Works proudly presents the Trial Assembly of the 165 m Mahalaxmi Cable Stayed ROB, covering Segments G11 to G15, carried out at our Alwar Unit.
The trial assembly was checked by RITES and BMC, reflecting our commitment to precision, quality and adherence to project requirements.
This milestone showcases Steel Works’ capability in heavy structural steel fabrication, precision assembly and complex bridge structures for landmark infrastructure projects.
Project: Mahalaxmi Cable Stayed ROB, Mumbai
Length: 165 m
Segments: G11 to G15
Checked by: RITES & BMC
Location: Steel Works – Alwar Unit
Steel Works — Built on Strength. Shaping a Sustainable Tomorrow.
Tunnel Lining Formwork Commissioned
Steel Works is proud to announce the successful manufacturing and commissioning of tunnel lining formwork for the Wardha–Nanded New Broad Gauge Line Project.
Engineered for precision, durability and efficient tunnel construction, the formwork reflects our capabilities in delivering specialised steel solutions for major railway infrastructure projects.
Project: Wardha–Nanded New Broad Gauge Line
Client: Dhorajia Constructions (Pvt.) Ltd.
Manufactured & Commissioned by: Steel Works
Key Specifications
- Tunnel Diameter: 8.364 m
- Formwork Length: 12,000 mm
- Longitudinal Module: 1,500 mm segments
- Tunnel Geometry: R4150, R5700 & R3587
From engineering and fabrication to site commissioning, Steel Works continues to build on strength and deliver precision-driven infrastructure solutions
Mahalaxmi Cable Stayed Bridge, Mumbai
Launching Completed Up to Segment 6!
Steel Works has successfully completed the launching up to Segment 6 of the main span for the Mahalaxmi Cable Stayed Bridge, Mumbai — a landmark infrastructure project contributing to a stronger and more connected Mumbai.
Our role as the Fabrication & Erection Agency reflects our expertise in precision steel fabrication, heavy structural engineering and complex bridge erection operations.
Project: Mahalaxmi Cable Stayed Bridge, Mumbai
Client: Brihan Mumbai Municipal Corporation (BMC)
Main Contractor: M/s APCO Infratech Pvt. Ltd.
Fabrication & Erection Agency: Steel Works
People. Projects. Partnerships. A Stronger India.
Mahalaxmi Cable Stayed Bridge, Mumbai
A Milestone in Mumbai’s Infrastructure Journey!
Steel Works is proud to be associated with the Mahalaxmi Cable Stayed Bridge, Mumbai, with launching completed up to Segment 5 of the main span.
Our role as the Fabrication & Erection Agency reflects our capabilities in precision steel fabrication, heavy structural engineering and complex bridge erection works.
Project: Mahalaxmi Cable Stayed Bridge, Mumbai
Client: Brihan Mumbai Municipal Corporation (BMC)
Main Contractor: M/s APCO Infratech Pvt. Ltd.
Fabrication & Erection Agency: Steel Works
Building structures that connect people, places and possibilities.
Elbow Duct Assembly - BHEL Thermal Project, Yamunanagar
Steel Works successfully manufactured a heavy steel Elbow Duct Assembly for BHEL’s Thermal Project at Yamunanagar, for end client Haryana Power Generation Corporation Limited (HPGCL).
Client: Bharat Heavy Electricals Limited (BHEL)
End Client: Haryana Power Generation Corporation Limited (HPGCL)
Dimension: 6210 x 3285 x 3525 mm (L x W x H)
Manufactured at: Our Alwar Unit
Trial Assembly of Steel Girder - NH 301 Kargil-Zanskar Road
86 Metre Open Web Girder Steel Bridge - Surat Metro Rail Project, Phase I
Delhi-Amritsar-Katra Expressway (Bharatmala Pariyojana)
Dimapur Tunnel Project
(Escape Tunnel)
Hydraulically Powered Self Propelled Hydraulic Steel Tunneling Lining Formwork System For Escape Tunnel for Dimapur Tunnel Project.
Client-
ABCI INFRASTRUCTURES PVT LTD
Size: 9.0 Meter Long
Kargil Project
Hydraulically powered, self-propelled steel tunnel lining formwork system for the Cut & Cover. Section with a 5m side wall height and a 5m radius dome. It includes hydraulically operated inner and outer formwork systems, each with a 6-meter shutter length, and a self-propelling traveller on rails, complete with kerb shutters and all accessories for the Kargil Project.
Client-
BORDER ROAD ORGANISATION
Size: 6.0 Meter Long
PEB Structures – Gyalsung Infra
For Gyalsung Infra, Steel Works successfully completed the Supply and Erection of 49 LD Sheds. This Pre-Engineered Building (PEB) project demonstrated our expertise in delivering efficient, high-quality steel structures to meet the client’s specific needs. The project was completed with precision, ensuring the timely delivery and installation of all units.
Client-
GYALSUNG INFRA
Arch String Girder Bridge,
Gelephu, Bhutan
Supply, Fabrication & Erection of 62m Span, 20m carriage way, 3D Arch String Girder has been successfully completed by us. The Bottom Chord & Arch is connected by Threaded Bars to make the bridge look aesthetically pleasing.
RISHIKESH KARNPRAYAG
Conceptualise, Design, Manufacture and Supply of Triple Track Tunnel Formwork system for Package 9 of Rishikesh – Karnprayag Rail Tunnel Project in Uttarakhand. The formwork system is 7.5m in length, 19.32m wide and 11m in height.
Haryana Orbital Rail Corridor
Cut & Cover Formwork System for the New BG Double Railway Line of Haryana Orbital Rail Corridor Project near Palwal and Sonipat, successfully commissioned for concrete casting by Steelworks & Power Engineers Pvt. Ltd. The project includes a 12m length formwork with 11.03m crown height and 11.03m wide circular gantry, delivering efficient and precise construction support for India’s growing railway infrastructure.
NHPC Teesta VI HEPP – 100m OWG Bridge
Erection and launching work for the 100m Open Web Girder (OWG) Bridge at NHPC Teesta VI HEPP is currently in progress by Steelworks & Power Engineers Pvt. Ltd. The project is being executed in challenging hilly terrain with high-precision engineering and strong structural expertise, supporting critical infrastructure development and reliable connectivity in the region.
Mahalaxmi Cable Stayed Bridge
Trial assembly for the main span of Mahalaxmi Cable Stayed Bridge has been successfully completed by Steelworks & Power Engineers Pvt. Ltd. The first two segments were assembled with a total weight of 225 MT and girder height of 6.5m. The project highlights precise engineering and strong fabrication expertise for India’s fast-growing bridge infrastructure
Surat Metro Rail Project
Trial assembly of the 74m span Open Web Girder (Welded Through Type) for the Surat Metro Rail Project has been successfully completed by Steelworks & Power Engineers Pvt. Ltd. The project reflects precision fabrication, strong engineering expertise, and quality execution, supporting the development of India’s fast-growing metro and rapid transit infrastructure.