projects

Excellence in Every Structure

Delhi-Amritsar-Katra Expressway (Bharatmala Pariyojana)

4 x 47.4m Span of COMPOSITE GIRDER in Four Lane Greenfield Delhi – Amritsar – Katra Expressway from Junction with Jind Panipat Road (NH 352A) near Gangana Village to Junction with Jind Karnal Road (NH 709A) near Alewa Village (Km 60+800 to Km 91+400) on Hybrid Annuity Mode under Bharatmala Pariyojana in the State of Haryana-Package-03, supplied and erected by Steelworks & Power Engineers. Pvt Ltd. The skew Angle of the span is :- 47˚

Dimapur Tunnel Project
(Escape Tunnel)

Hydraulically Powered Self Propelled Hydraulic Steel Tunneling Lining Formwork System For Escape Tunnel for Dimapur Tunnel Project.

Client-

ABCI INFRASTRUCTURES PVT LTD

Size: 9.0 Meter Long

Kargil Project

Hydraulically powered, self-propelled steel tunnel lining formwork system for the Cut & Cover. Section with a 5m side wall height and a 5m radius dome. It includes hydraulically operated inner and outer formwork systems, each with a 6-meter shutter length, and a self-propelling traveller on rails, complete with kerb shutters and all accessories for the Kargil Project.

Client-

BORDER ROAD ORGANISATION

Size: 6.0 Meter Long

PEB Structures – Gyalsung Infra

For Gyalsung Infra, Steel Works successfully completed the Supply and Erection of 49 LD Sheds. This Pre-Engineered Building (PEB) project demonstrated our expertise in delivering efficient, high-quality steel structures to meet the client’s specific needs. The project was completed with precision, ensuring the timely delivery and installation of all units.

Client-

GYALSUNG INFRA

Arch String Girder Bridge,
Gelephu, Bhutan

Supply, Fabrication & Erection of 62m Span, 20m carriage way, 3D Arch String Girder has been successfully completed by us. The Bottom Chord & Arch is connected by Threaded Bars to make the bridge look aesthetically pleasing.

RISHIKESH KARNPRAYAG

Conceptualise, Design, Manufacture and Supply of Triple Track Tunnel Formwork system for Package 9 of Rishikesh – Karnprayag Rail Tunnel Project in Uttarakhand. The formwork system is 7.5m in length, 19.32m wide and 11m in height.

Haryana Orbital Rail Corridor

Cut & Cover Formwork System for the New BG Double Railway Line of Haryana Orbital Rail Corridor Project near Palwal and Sonipat, successfully commissioned for concrete casting by Steelworks & Power Engineers Pvt. Ltd. The project includes a 12m length formwork with 11.03m crown height and 11.03m wide circular gantry, delivering efficient and precise construction support for India’s growing railway infrastructure.

NHPC Teesta VI HEPP – 100m OWG Bridge

Erection and launching work for the 100m Open Web Girder (OWG) Bridge at NHPC Teesta VI HEPP is currently in progress by Steelworks & Power Engineers Pvt. Ltd. The project is being executed in challenging hilly terrain with high-precision engineering and strong structural expertise, supporting critical infrastructure development and reliable connectivity in the region.

Mahalaxmi Cable Stayed Bridge

Trial assembly for the main span of Mahalaxmi Cable Stayed Bridge has been successfully completed by Steelworks & Power Engineers Pvt. Ltd. The first two segments were assembled with a total weight of 225 MT and girder height of 6.5m. The project highlights precise engineering and strong fabrication expertise for India’s fast-growing bridge infrastructure

Surat Metro Rail Project

Trial assembly of the 74m span Open Web Girder (Welded Through Type) for the Surat Metro Rail Project has been successfully completed by Steelworks & Power Engineers Pvt. Ltd. The project reflects precision fabrication, strong engineering expertise, and quality execution, supporting the development of India’s fast-growing metro and rapid transit infrastructure.