projects

Excellence in Every Structure

🏗️ Precision in Every Span. Strength in Every Structure.

Steel Works proudly presents the trial assembly of a 62-metre Open Web Girder for a Rail Overbridge (ROB) across the Howrah–Mumbai Railway Line.

📍 Project Location: Near Jairam Nagar Railway Station Yard, Masturi–Seepat Road
📐 Key Specifications:
▪️ Length: 62 m (Centre to Centre)
▪️ Width: 16.3 m (Centre to Centre)
▪️ Height: 8.1 m (Centre to Centre)

This project showcases our expertise in heavy structural steel fabrication, precision engineering and complex bridge assembly, supporting the development of India’s railway infrastructure.

At Steel Works, we continue to build on strength and deliver engineering excellence, one structure at a time.

STEEL WORKS
Built on Strength. Shaping a Sustainable Tomorrow.

#SteelWorks #SteelBridges #OpenWebGirder #RailwayInfrastructure #HeavyFabrication #StructuralSteel #BridgeEngineering #InfrastructureDevelopment #MakeInIndia

Precision. Collaboration. Engineering Excellence.

Steel Works proudly presents the Trial Assembly of the 165 m Mahalaxmi Cable Stayed ROB, covering Segments G11 to G15, carried out at our Alwar Unit.

The trial assembly was checked by RITES and BMC, reflecting our commitment to precision, quality and adherence to project requirements.

This milestone showcases Steel Works’ capability in heavy structural steel fabrication, precision assembly and complex bridge structures for landmark infrastructure projects.

Project: Mahalaxmi Cable Stayed ROB, Mumbai

Length: 165 m

Segments: G11 to G15

Checked by: RITES & BMC

Location: Steel Works – Alwar Unit

Steel Works — Built on Strength. Shaping a Sustainable Tomorrow.

Tunnel Lining Formwork Commissioned

Steel Works is proud to announce the successful manufacturing and commissioning of tunnel lining formwork for the Wardha–Nanded New Broad Gauge Line Project.

Engineered for precision, durability and efficient tunnel construction, the formwork reflects our capabilities in delivering specialised steel solutions for major railway infrastructure projects.

Project: Wardha–Nanded New Broad Gauge Line
Client: Dhorajia Constructions (Pvt.) Ltd.
Manufactured & Commissioned by: Steel Works

Key Specifications

  • Tunnel Diameter: 8.364 m
  • Formwork Length: 12,000 mm
  • Longitudinal Module: 1,500 mm segments
  • Tunnel Geometry: R4150, R5700 & R3587

From engineering and fabrication to site commissioning, Steel Works continues to build on strength and deliver precision-driven infrastructure solutions

Mahalaxmi Cable Stayed Bridge, Mumbai

Launching Completed Up to Segment 6!

Steel Works has successfully completed the launching up to Segment 6 of the main span for the Mahalaxmi Cable Stayed Bridge, Mumbai — a landmark infrastructure project contributing to a stronger and more connected Mumbai.

Our role as the Fabrication & Erection Agency reflects our expertise in precision steel fabrication, heavy structural engineering and complex bridge erection operations.

Project: Mahalaxmi Cable Stayed Bridge, Mumbai
Client: Brihan Mumbai Municipal Corporation (BMC)
Main Contractor: M/s APCO Infratech Pvt. Ltd.
Fabrication & Erection Agency: Steel Works

People. Projects. Partnerships. A Stronger India.

Mahalaxmi Cable Stayed Bridge, Mumbai

A Milestone in Mumbai’s Infrastructure Journey!

Steel Works is proud to be associated with the Mahalaxmi Cable Stayed Bridge, Mumbai, with launching completed up to Segment 5 of the main span.

Our role as the Fabrication & Erection Agency reflects our capabilities in precision steel fabrication, heavy structural engineering and complex bridge erection works.

Project: Mahalaxmi Cable Stayed Bridge, Mumbai
Client: Brihan Mumbai Municipal Corporation (BMC)
Main Contractor: M/s APCO Infratech Pvt. Ltd.
Fabrication & Erection Agency: Steel Works

Building structures that connect people, places and possibilities.

Elbow Duct Assembly - BHEL Thermal Project, Yamunanagar

Steel Works successfully manufactured a heavy steel Elbow Duct Assembly for BHEL’s Thermal Project at Yamunanagar, for end client Haryana Power Generation Corporation Limited (HPGCL).

Client: Bharat Heavy Electricals Limited (BHEL)
End Client: Haryana Power Generation Corporation Limited (HPGCL)
Dimension: 6210 x 3285 x 3525 mm (L x W x H)
Manufactured at: Our Alwar Unit

Trial Assembly of Steel Girder - NH 301 Kargil-Zanskar Road

Steel Works carried out the trial assembly of a 53.0 m span steel girder, manufactured at our Alwar unit, for the widening and upgradation of NH 301 (Kargil-Zanskar Road) to a 2-lane road with paved shoulder in the UT of Ladakh, executed on EPC mode (Package-II). Client: National Highways and Infrastructure Development Corporation Limited (NHIDCL) Contractor: M/s Topline Infra Projects Pvt. Ltd. Span: 1 x 53 m Manufactured at: Our Alwar Unit

86 Metre Open Web Girder Steel Bridge - Surat Metro Rail Project, Phase I

Steel Works & Power Engineers (P) Ltd. designed, fabricated and supplied an 86-metre-long Open Web Girder Steel Bridge for the Surat Metro Rail Project – Phase I, contributing to the elevated viaduct infrastructure of the project. Client: Gujarat Metro Rail Corporation Main Contractor: M/s Dilip Buildcon Ltd. Structure: 86 m Open Web Girder Steel Bridge

Delhi-Amritsar-Katra Expressway (Bharatmala Pariyojana)

4 x 47.4m Span of COMPOSITE GIRDER in Four Lane Greenfield Delhi – Amritsar – Katra Expressway from Junction with Jind Panipat Road (NH 352A) near Gangana Village to Junction with Jind Karnal Road (NH 709A) near Alewa Village (Km 60+800 to Km 91+400) on Hybrid Annuity Mode under Bharatmala Pariyojana in the State of Haryana-Package-03, supplied and erected by Steelworks & Power Engineers. Pvt Ltd. The skew Angle of the span is :- 47˚

Dimapur Tunnel Project
(Escape Tunnel)

Hydraulically Powered Self Propelled Hydraulic Steel Tunneling Lining Formwork System For Escape Tunnel for Dimapur Tunnel Project.

Client-

ABCI INFRASTRUCTURES PVT LTD

Size: 9.0 Meter Long

Kargil Project

Hydraulically powered, self-propelled steel tunnel lining formwork system for the Cut & Cover. Section with a 5m side wall height and a 5m radius dome. It includes hydraulically operated inner and outer formwork systems, each with a 6-meter shutter length, and a self-propelling traveller on rails, complete with kerb shutters and all accessories for the Kargil Project.

Client-

BORDER ROAD ORGANISATION

Size: 6.0 Meter Long

PEB Structures – Gyalsung Infra

For Gyalsung Infra, Steel Works successfully completed the Supply and Erection of 49 LD Sheds. This Pre-Engineered Building (PEB) project demonstrated our expertise in delivering efficient, high-quality steel structures to meet the client’s specific needs. The project was completed with precision, ensuring the timely delivery and installation of all units.

Client-

GYALSUNG INFRA

Arch String Girder Bridge,
Gelephu, Bhutan

Supply, Fabrication & Erection of 62m Span, 20m carriage way, 3D Arch String Girder has been successfully completed by us. The Bottom Chord & Arch is connected by Threaded Bars to make the bridge look aesthetically pleasing.

RISHIKESH KARNPRAYAG

Conceptualise, Design, Manufacture and Supply of Triple Track Tunnel Formwork system for Package 9 of Rishikesh – Karnprayag Rail Tunnel Project in Uttarakhand. The formwork system is 7.5m in length, 19.32m wide and 11m in height.

Haryana Orbital Rail Corridor

Cut & Cover Formwork System for the New BG Double Railway Line of Haryana Orbital Rail Corridor Project near Palwal and Sonipat, successfully commissioned for concrete casting by Steelworks & Power Engineers Pvt. Ltd. The project includes a 12m length formwork with 11.03m crown height and 11.03m wide circular gantry, delivering efficient and precise construction support for India’s growing railway infrastructure.

NHPC Teesta VI HEPP – 100m OWG Bridge

Erection and launching work for the 100m Open Web Girder (OWG) Bridge at NHPC Teesta VI HEPP is currently in progress by Steelworks & Power Engineers Pvt. Ltd. The project is being executed in challenging hilly terrain with high-precision engineering and strong structural expertise, supporting critical infrastructure development and reliable connectivity in the region.

Mahalaxmi Cable Stayed Bridge

Trial assembly for the main span of Mahalaxmi Cable Stayed Bridge has been successfully completed by Steelworks & Power Engineers Pvt. Ltd. The first two segments were assembled with a total weight of 225 MT and girder height of 6.5m. The project highlights precise engineering and strong fabrication expertise for India’s fast-growing bridge infrastructure

Surat Metro Rail Project

Trial assembly of the 74m span Open Web Girder (Welded Through Type) for the Surat Metro Rail Project has been successfully completed by Steelworks & Power Engineers Pvt. Ltd. The project reflects precision fabrication, strong engineering expertise, and quality execution, supporting the development of India’s fast-growing metro and rapid transit infrastructure.