projects
Excellence in Every Structure
Delhi-Amritsar-Katra Expressway (Bharatmala Pariyojana)
Dimapur Tunnel Project
(Escape Tunnel)
Hydraulically Powered Self Propelled Hydraulic Steel Tunneling Lining Formwork System For Escape Tunnel for Dimapur Tunnel Project.
Client-
ABCI INFRASTRUCTURES PVT LTD
Size: 9.0 Meter Long
Kargil Project
Hydraulically powered, self-propelled steel tunnel lining formwork system for the Cut & Cover. Section with a 5m side wall height and a 5m radius dome. It includes hydraulically operated inner and outer formwork systems, each with a 6-meter shutter length, and a self-propelling traveller on rails, complete with kerb shutters and all accessories for the Kargil Project.
Client-
BORDER ROAD ORGANISATION
Size: 6.0 Meter Long
PEB Structures – Gyalsung Infra
For Gyalsung Infra, Steel Works successfully completed the Supply and Erection of 49 LD Sheds. This Pre-Engineered Building (PEB) project demonstrated our expertise in delivering efficient, high-quality steel structures to meet the client’s specific needs. The project was completed with precision, ensuring the timely delivery and installation of all units.
Client-
GYALSUNG INFRA
Arch String Girder Bridge,
Gelephu, Bhutan
Supply, Fabrication & Erection of 62m Span, 20m carriage way, 3D Arch String Girder has been successfully completed by us. The Bottom Chord & Arch is connected by Threaded Bars to make the bridge look aesthetically pleasing.
RISHIKESH KARNPRAYAG
Conceptualise, Design, Manufacture and Supply of Triple Track Tunnel Formwork system for Package 9 of Rishikesh – Karnprayag Rail Tunnel Project in Uttarakhand. The formwork system is 7.5m in length, 19.32m wide and 11m in height.
Haryana Orbital Rail Corridor
Cut & Cover Formwork System for the New BG Double Railway Line of Haryana Orbital Rail Corridor Project near Palwal and Sonipat, successfully commissioned for concrete casting by Steelworks & Power Engineers Pvt. Ltd. The project includes a 12m length formwork with 11.03m crown height and 11.03m wide circular gantry, delivering efficient and precise construction support for India’s growing railway infrastructure.
NHPC Teesta VI HEPP – 100m OWG Bridge
Erection and launching work for the 100m Open Web Girder (OWG) Bridge at NHPC Teesta VI HEPP is currently in progress by Steelworks & Power Engineers Pvt. Ltd. The project is being executed in challenging hilly terrain with high-precision engineering and strong structural expertise, supporting critical infrastructure development and reliable connectivity in the region.
Mahalaxmi Cable Stayed Bridge
Trial assembly for the main span of Mahalaxmi Cable Stayed Bridge has been successfully completed by Steelworks & Power Engineers Pvt. Ltd. The first two segments were assembled with a total weight of 225 MT and girder height of 6.5m. The project highlights precise engineering and strong fabrication expertise for India’s fast-growing bridge infrastructure
Surat Metro Rail Project
Trial assembly of the 74m span Open Web Girder (Welded Through Type) for the Surat Metro Rail Project has been successfully completed by Steelworks & Power Engineers Pvt. Ltd. The project reflects precision fabrication, strong engineering expertise, and quality execution, supporting the development of India’s fast-growing metro and rapid transit infrastructure.
